Case Study: UK Oil Storage

The Oikos storage facility on the River Thames near London was constructed originally in 1936. A large Australian financial conglomerate contacted PDC to carry out a technical and environment due diligence study of the facility in 2006. The facility consists of more than 100 tanks with a capacity of 300,000 m3 as well as a jetty. PDC appointed RAW Consulting to provide assistance in the environmental due diligence.

The project was completed in a very short three month period and the Client purchased 50% of the facility in 2007 with an option to purchase the remaining 50% in 2008.

“The draft was forwarded to a contact of ours in the industry and his appraisal of the comprehensiveness of your report was glowing. Well done.” Company Representative
Oikos TankOikos Storage Facility

Contact Details

 

London Office

Stanhope House
4-8 Highgate High Street
London, N6 5JL, UK

Tel:  +44 (0)20 8347 3498
Fax: +44 (0)20 8347 3499

 
Aberdeen Office

1 Berry Street
Aberdeen, AB25 1HF, UK

Tel:  +44 (0)1224 843717
Fax: +44 (0)1224 841301